190.210-IOM (SEP 21)
Page 9
LazerWeld II Plate Heat Exchanger
Installation
3. Position the LZWII on the timber posts.
Figure 13: LZWII on timber posts
4. Place straps around one bolt on each side.
Figure 14: Straps
5. Lift the LZWII off the timber posts.
Figure 15: Lifting LZWII with straps
6.
Lower the LZWII onto the floor in a horizontal position.
Figure 16: LZWII, horizontal
Connecting to the system
Before connecting any piping, complete the following:
• Ensure that no foreign objects have been left in the
system that connects to the LZWII.
• Remove the sealing blind covers from the port holes.
When connecting the piping system, complete the follow-
ing steps:
1. Ensure the pipes do not subject the LZWII to stress or
strain.
2.
Install a strainer or filter with 0.5 mm to 1.0 mm mesh
size to prevent problems with foreign objects in the
piping system.
NOTICE
Frick suggests installing an external secondary media
inlet strainer with a mesh size of between 0.5 mm to
1.0 mm.