POKER-01

 

POKER-01

 

+1/2 CAM

 

POKER-02

 

POKER-02

 

+1/2 CAM

 

POKER-03

 

POKER-03

 

+1/2 CAM

 

POKER-04

 

End Section Assembly 

The end section is equivalent to an intermediate section which however uses the specific POK DAVTER end 
sills and adds for each short side of the scaffold no. 1 POK PROTCO short protection brace to guarantee the 
minimum regulatory height of the guardrail, and adds for each side no. 1 POK PROTRAV guardrail brace as an 
intermediate handrail brace.

 

Having reached the desired height, assemble the end section as in the drawing:

 

1) 

Connect two POK SPALLA vertical uprights on the sills of the current section 

[See S.H.P. page 9]

 

2) Assemble the two, gold coloured POK DAVTER end sills in the end position,

 

3) 

Fasten the section by coupling no. 2 PTIR tie rods to the pawls, on both sides to form a double X.  

4) On both short sides of the scaffold, install the POK PROTCO short protection braces, tightening the clamps 

on the vertical tube immediately over the last POK DAVTER sill

 

5) Then, install on both long sides of the scaffold the POK PROTRAV guardrail braces, resting them on the 2

nd

 

rung over the work platform, so it is positioned at a distance of approx

. 0.58 m over the work platform, 

manually tightening the clamps on the vertical tubes. 

 

N.B. The anti-uncoupling safety devices must be assembled on the work platforms (no. 2 

diagonally on each platform). Ensure their correct work position (see left panel).

 

NOTE: If you intend working on work platforms assembled at intermediate heights of the mobile scaffold, 
all the POK PROTRAV side protection 

(supplied on request) 

must be installed to allow you to always 

have regulatory protection and complete toe boards.

 

 

Anchorage Systems

 

The POKER mobile scaffold is subject to compulsory 
anchorage. Anchor the mobile scaffold every two metres 
even when assembled it is not in use. 

Anchor the mobile scaffold to the perimeter uprights and 
ensure a max. strain of 60 kg on each anchorage. 

The anchorage operation must only be carried 
out by competent staff.

 

Anchorage using retaining (or rigging) cables, which 
must always be controlled for tension and knots, must 
be supported by the calculations made by a qualified 
professional.

 

POKER use configuration with compulsory anchorage.

 

 

(For POKER-HD see page 7)

 

 

6.78

 

 

 

Useful working height

 

+ 2 m

 

5.97

 

Total height: + 1.01 m

 

5.13

 

4.32

 

 Platform height

 

3.51

 

2.71

 

1.90

 

5

 

COMPULSORY 
ANCHORAGE

 

Anchor to fixed parts

 

Summary of Contents for POKER

Page 1: ...mobile scaffolding POKER POKER HD Compulsory warnings for assembly use movements and dismantling of the mobile scaffold This manual must always accompany the mobile scaffold if it must be shown to com...

Page 2: ...2 2 2 2 2 2 P TIR L Diagonal tie rod 1 1 4 4 8 8 12 12 16 POK 1 2 TIR Half diagonal tie rod 0 8 0 4 0 4 0 4 0 POK BN SR Complete base No 2 pieces without castors 4 8 1 1 1 1 1 1 1 POK RUOTA Castors 1...

Page 3: ...mbing on the mobile scaffold during assembly use and after each movement always check the brackets are correctly and firmly positioned End Sill POK DAVTER Vertical Upright POK SPALLA For POKER 01 only...

Page 4: ...ngs on the vertical uprights or if necessary the climbing ladders available on request Having passed through the work platform always ensure the trapdoor is closed Always work on a work platform prote...

Page 5: ...e work platform so it is positioned at a distance of approx 0 58 m over the work platform manually tightening the clamps on the vertical tubes N B The anti uncoupling safety devices must be assembled...

Page 6: ...POK DAVANZ Sill 3 0 0 2 2 4 4 6 6 POK DAVTER End Sill 2 9 2 2 2 2 2 2 2 P TIR L Diagonal tie rod 1 1 4 4 8 8 12 12 16 POK 1 2 TIR Half diagonal tie rod 0 8 0 4 0 4 0 4 0 POK BN SR Complete base in two...

Page 7: ...m and 1 10 m over the work platform and the other brace acts as an intermediate handrail resting on the 2nd rung over the work platform so it is positioned at a distance of approx 0 58 m over the work...

Page 8: ...on which the tower is moved must be capable of supporting the weight After each movement braking and stabilising the mobile scaffold is compulsory Also check it is perfectly vertical It is forbidden t...

Page 9: ...llowing the instructions provided to guarantee state of the art execution and if this is in the vertical position Before each use you must ensure all the safety measures were taken to prevent accident...

Page 10: ...main contents of specific training planned in the State Regions Agreement on the 21 December 2011 Reference Standards L D 81 9 April 2008 Consolidated Safety Act Uni EN 1004 2005 Mobile access and wo...

Page 11: ...installation of protective equipment against falling The aforementioned equipment may present such a configuration and resistance to avoid or stop falling from workplaces at heights and prevent as muc...

Page 12: ...when workers or loads are on them DECLARATION OF CONFORMITY It is hereby certified that the scaffold on a POKER base was constructed in compliance with Legislative Decree 81 on 9 April 2008 It is also...

Page 13: ...ary protecting from dirt by applying a strip of transparent adhesive tape Test date Part examined Test OK Test NOT OK Description of fault Name of test person Signature Repair date Repair type Name of...

Page 14: ...the event of test OK or test NOT OK if necessary protecting from dirt by applying a strip of transparent adhesive tape Test date Part examined Test OK Test NOT OK Description of fault Name of test per...

Page 15: ...the event of test OK or test NOT OK if necessary protecting from dirt by applying a strip of transparent adhesive tape Test date Part examined Test OK Test NOT OK Description of fault Name of test pe...

Page 16: ...www frigeriospa com Frigerio Carpenterie S p A V Fermi 6 24050 Orio Al Serio BG Fax 035 525147 E mail info frigeriospa com...

Reviews: