2. Electrical system:
Check the power cable (replace if needed).
Check the illumination system.
Check the electrical connections.
Check that the electrical box cover of the thermostat or the electronic controller is properly
installed.
Check that components that might have been replaced during servicing are original.
3. Refrigeration system:
Check that the compressor is functioning properly.
Check the starting relay, the overload and the capacitor. The Supplier recommends that the
compressor's starting relays and overloads be replaced every 3-4 years.
Check the fan motor condenser and fan motor evaporator.
Check that the thermostat or the electronic controller and its components are functioning properly.
Check the cooling performance of the ICM.
Check the cooling circuit using the appropriate leak detector in case there is any concern or sign
of refrigerant leak.
The Supplier recommends that the compressor's starting relays and overloads be replaced every 3-4
years.
Do not damage the refrigerant circuit.
APPENDIX C
GUIDELINES TO PREVENT CORROSION OF THE CABINET
1.
Avoid damages resulting from improper installation & operation, improper maintenance &
cleaning, as well as improper handling and transportation, as per paragraphs 3, 5 and the
Appendix A above.
2.
Do not perform unauthorised adaptations, modifications or adjustments to the cabinet.