❒ Insert one countersunk cross-head screw each to the left and right through the
bracket and control from below
❒ Use nuts to secure the countersunk cross-head screws from the top.
❒ Put the top heat insulation mat on
➥ The heat insulation mat must touch the front sheet
❒ Place the controller box on the boiler
❒ Use eight thread forming screws incl. contact washers (1) to install controller box
on the cable duct of the side panels
Assembly
4
Installing the boiler
Installation Instructions S3 Turbo | M1080813_en
43
All manuals and user guides at all-guides.com