Operating the System | 4
B1510622_en | Operating instructions Firewood boiler S4 Turbo
31
1. First layer of small pieces of split wood
2. Second layer of cardboard
3. Place a piece of cardboard in front of the igniter tube (A)
4. Third layer with more small pieces of split wood
5. Fill the rest with firewood in accordance with the output
Definition of small pieces of wood:
Firewood with a maximum length of 10 cm along the edge to the cut
r
Use firewood with a length of approximately 50 cm and arrange it lengthwise
r
The burn-out opening in the grate must remain free!
r
Close the fuel loading door and insulated door
Ä
The boiler changes to "preventilation" status. To guarantee a safe boiler operating
status and to rule out possible ignition by residual embers due to incomplete
cleaning of the combustion chamber, the boiler attempts to reach "Heating" status
within a specified safety time without activating the ignition.
Ä
After this time has elapsed the boiler remains in "ignition wait" status until the time
specified in the ignition menu for automatic ignition has been reached.
NOTICE! See the instruction manual for the boiler controller!