Operating the System | 4
B1510622_en | Operating instructions Firewood boiler S4 Turbo
23
4 Operating the System
4.1 Assembly and initial startup
Assembly, installation and initial startup of the boiler must only be carried out by qualified
staff, and these procedures are described in the accompanying assembly instructions.
NOTICE! See assembly instructions for the
S4 Turbo
NOTICE
Optimum efficiency and efficient, low-emission operation can only be guaranteed if the
system is set up by trained professionals and the standard factory settings are observed.
Take the following precautions:
r
Initial startup should be carried out with an authorised installer or with Froling
customer services
The individual steps for initial start-up are explained in the operating instructions for the
controller
NOTICE! See operating instructions for boiler controller!
The customer is responsible for ensuring the following prior to initial start-up of the
system by Froling customer services:
▪ Electrical installation
▪ Installation of water pipes
▪ Connect flue gas including all insulation work
▪ Work must comply with local fire protection regulations
▪ Correct assembly / setting of the air duct according to firewood used, see boiler
assembly instructions
▪ When heating up the boiler for the first time to dry out the fireclay concrete, the
customer must provide approx. 0.5 m³ of dry firewood.
▪ It is essential that the electrician who has carried out the installation work is available
when starting up the system for the first time to make any changes to the wiring which
may become necessary.
▪ During initial start-up, operating staff are shown how to use the boiler. It is imperative
for proper handover of the product that those involved are present as this is a one-off
opportunity.
NOTICE
If condensation escapes during the initial heat-up phase, this does not indicate a fault.
r
Tip: If this occurs, clean up using a cleaning rag.