60
Startup phase and feeding energy into the grid
Startup phase
Once it has been switched on automatically, the inverter carries out the following tests and
checks:
a) Self-test of all important inverter components - the inverter runs through a virtual
checklist
b) Synchronisation with the grid
c)
Startup test
Before the inverter starts feeding energy into the grid, the grid conditions according to
national regulations are tested.
Depending on the country-specific regulations, the startup test can last just a few sec-
onds or take several minutes.
During the startup phase:
-
the operating state LED shows orange,
-
the string 'warte...' (wait...) and the currently tested component are displayed, e.g.:
Feeding energy
into the grid
-
Once the tests have been completed the inverter starts feeding energy into the grid
-
The display shows the current energy level that is being fed into the grid, e.g.:
-
The operating state LED shows green, the inverter is working.
Summary of Contents for Agilo 100.0-3
Page 2: ...0...
Page 4: ...2...
Page 8: ...6...
Page 13: ...General information...
Page 14: ......
Page 30: ...28...
Page 31: ...Installation and commissioning...
Page 32: ......
Page 51: ...49 EN 1 2 Inserting the fuse grounds the solar modules on the negative pole 1 1 1 2 2...
Page 53: ...51 EN 2 3 Tightening torque 3 Nm 1 3 2 4 5 4 3 2 4 5 1 5...
Page 57: ...Operation...
Page 58: ......
Page 84: ...82...
Page 85: ...Troubleshooting and maintenance...
Page 86: ......
Page 107: ...Appendix...
Page 108: ......