55
EN-US
Startup Phase and Grid Feed-in Mode
Startup phase
The inverter carries out a self test after being turned on automatically. Then a test of the
public grid is carried out. This test takes five minutes. During the startup sequence the illu-
mination of the Operating Status LED is yellow.
Test procedure
1.
Segment test
All display elements light up for about one second
2.
Self test of essential inverter components
-
The inverter goes through a master check list for several seconds
-
The display shows ‘TEST’ and indicates the respective component that is being
tested (for example, ‘LED’)
3.
Synchronization with grid:
-
‘WAIT PS’ is displayed, the inverter icon flashes: The inverter is waiting for all
power stage sets in the network to be on stand-by. This procedure takes place
dependent on the DC voltage
-
Next, the display shows ‘SYNC AC,’ the grid icon flashes.
4.
Startup test
-
Before the inverter starts feeding energy into the grid, the conditions of the grid
are tested in accordance with local regulations.
-
The display shows ‘START UP.’
Summary of Contents for IG 2000
Page 2: ...0...
Page 4: ...2...
Page 6: ...4...
Page 10: ...8...
Page 15: ...General Information...
Page 16: ......
Page 21: ...Installation and Startup...
Page 22: ......
Page 50: ...48...
Page 51: ...Operation...
Page 52: ......
Page 80: ...78...
Page 81: ...Troubleshooting and Maintenance...
Page 82: ......
Page 95: ...Appendix...
Page 96: ......
Page 113: ...111 EN US...
Page 114: ...112...
Page 115: ...113 EN US...