56
The startup test takes five minutes. The time elapsed is indicated by a bar shrinking
from the top down.
Whenever two scale divisions stop flashing and disappear, 1/10 of the total duration
of the test is over.
Operation of
Feeding Energy
into the Grid
-
Once the tests have been completed, the inverter starts feeding power into the grid.
-
The display shows the present power feeding into the grid.
-
The Operating Status LED lights up green, and the inverter starts operating.