Robacta TC 2000
dipping bowl pro-
gram sequence
Move to position B
approx. 200 mm/7.9 in. centrally above
dipping bowl
Speed: High-speed mode
B
50 mm
1.97 in.
75 mm
2.95 in.
Max. insertion depth
Move into dipping bowl
max. speed: 50 cm/min / 19.69 ipm
max. insertion depth: 75 mm / 2.95 in.
Wait 2-3 seconds
Move to position B
approx. 200 mm/7.9 in. centrally above
dipping bowl
max. speed: 50 cm/min (19.69 ipm)
Set
gas purging through welding torch
(option)
Wait 0.5 seconds
Reset
gas purging through welding torch
(option)
72
Summary of Contents for Robacta TSS /i
Page 2: ......
Page 11: ...General 11 ...
Page 12: ...12 ...
Page 18: ...18 ...
Page 19: ...Operating controls connections and mechanical components 19 ...
Page 20: ...20 ...
Page 32: ...32 ...
Page 33: ...Installation and Startup 33 ...
Page 34: ...34 ...
Page 61: ...12 12 12 Connect the compressed air supply 61 EN US ...
Page 64: ...64 ...
Page 65: ...Cleaning Program Sequence 65 ...
Page 66: ...66 ...
Page 68: ...A B C D E F G 68 ...
Page 79: ...Reset external signal Internal valve brush cleaning 79 EN US ...
Page 84: ...Reset external signal Cut wire electrode End of the cleaning process Welding 84 ...
Page 85: ...Troubleshooting Maintenance and Disposal 85 ...
Page 86: ...86 ...
Page 97: ...Appendix 97 ...
Page 98: ...98 ...