background image

STEP 10: Attach folding tube frame top by attaching to each of the 4 

top post clips.

STEP 11A: Lay top fabric over 

top frame.

STEP 11B:  Attach fabric to top frame at each corner and half way up frame. 8 total.

PAGE 3

STEP 12: For Closed Fabric posi-

tion, zip all sides.

WARNING: If possible, move towel valet to an indoor location during 

high winds to prevent any damage.

To minimize danger, leave fabric sides open (unzipped) during high 

winds or fold flat.

Please contact one of our Product Specialists for assembly assistance or 

questions at 1-800-537-8484 or e-mail ps@frontgate.com 

Specialists are available weekdays 8:00am to 8:00pm. EST or Saturday 

9:30am to 6pm.

Reviews: