Frymaster L.L.C., 8700 Line Avenue 71106, P.O. Box 51000, Shreveport, Louisiana 71135-1000
318-865-1711 FAX 318-862-2394
Printed in the United States
Service Hotline
Page
3
1-800-24-FRYER
3. HEATED LANDING ZONE
The
Heated Landing Zone
or
HLZ
is designed to hold assembled sandwiches. By circulating heated
air evenly across the open staging area, the Heated Landing Zone keeps sandwiches hot without
drying or cooking. The Heated Landing Zone meets all McDonald’s standards for safety, efficiency,
food safety, and cleanliness.
4. INSTALLATION/SETUP
Upon arrival, inspect the HLZ for concealed damage.
Immediately report any damage to the delivering freight
company. Claims must be filed within 15 days after
receipt of the unit.
Make sure that the unit is placed on an even surface and
that the area surrounding the HLZ is free of clutter that
would interfere with air flow.
INSTALL OPTIONAL BURGER BUMPER (Units built before 10/98)
The burger bumper may be placed on either side of the
HLZ to prevent pass through of product. Burger bumpers
are provided by the KES. See figure 1.
INSTALL FILTER SCREEN (Units built after 10/98)
The filter screen is design to prevent debris from entering
the Computer Cowl Assembly and clogging the blower
assembly. Simply fit the part on to the vent opening of the
computer cowl assembly. The filter screen will snap into
position. If equipped with an optional holding screw,
tighten screw to pull the filter screen snug into position.
POWER REQUIREMENTS:
•
Voltage – Two models are available: 208 VAC and 240 VAC*
•
Frequency - 60 Hz
•
Single
Phase
•
20 amp Service
5. OPERATION
1. Plug the unit into the power source.*
2. See “
HLZ COMPUTER OPERATION AND
PROGRAMMING, Section 7”
for proper setup and
operation of the computer.
3. Place product in the HLZ in accordance with the
restaurant’s established procedures.
4.
CLOSING
- When closing the store, remove all product from the HLZ and perform daily preventive
maintenance in accordance with the MRC. Turn the computer OFF.
THIS APPLIANCE IS EQUIPPED WITH A
GROUNDING PLUG FOR YOUR
PROTECTION AGAINST SHOCK
HAZARD AND MUST BE PLUGGED INTO
A PROPERLY GROUNDED
RECEPTACLE. DO NOT CUT OR
REMOVE THE GROUNDING PRONG
FROM THIS PLUG.
Figure 1
Optional Burger Bumper
Installed (unit built before 10/98)
Computer
Cowl
* If the 240 VAC model is operated on
208 VAC, the unit will heat slowly and
may not reach maximum temperature. If
the 208 VAC model is operated on 240
VAC, component damage is probable.
To ensure proper operation, the power
source should match the voltage on the
rating plate on the bottom of the HLZ.
The filter screen snaps into place on
rear of the air-intake tower.