background image

11 

 

 

Warning: 

(Only for standard model) 

● Make sure the UPS is not turned on before installation. The UPS should not be turned on during wiring 

connection. 

● Do not try to modify the standard model to the long-run model. Particularly, do not try to connect the 

standard internal battery to the external battery. The battery type and voltage may be different. If you 
connect them together, it maybe causes the hazard of electric shock or fire! 

 

Warning:

 (Only for long-run model) 

● Make sure a DC breaker or other protection device between UPS and external battery pack is installed. If 

not, please install it carefully. Switch off the battery breaker before installation. 

NOTE: 

Set the battery pack breaker in “OFF” position and then install the battery pack. 

● Pay highly attention to the rated battery voltage marked on the rear panel. If you want to change the 

numbers of the battery pack, please make sure you modify the setting simultaneously. The connection 
with wrong battery voltage may cause permanent damage of the UPS. Make sure the voltage of the 
battery pack is correct. 

●  Pay  highly  attention  to  the  polarity  marking  on  external  battery  terminal  block,  and  make  sure  the 

correct battery polarity is connected. Wrong connection may cause permanent damage of the UPS. 

●  Make  sure  the  protective  earth  ground  wiring  is  correct.  The  wire  current  spec,  color,  position, 

connection and conductance reliability should be checked carefully. 

● Make sure the utility input & output wiring is correct. The wire current spec, color, position, connection 

and conductance reliability should be checked carefully. Make sure the L/N site is correct, not reverse 
and short-circuited. 

● Before turning on the UPS, be sure the breaker of the battery pack is on. 

● UPS will alert while the external battery breaker is not on. If so, turn on the external battery breaker and 

press “test” button on the UPS to release the audible alert. 

 

2-4. UPS Installation for Parallel System 

If the UPS is only available for single operation, you may skip this section to the next. 

1)

 

Install and wires the UPSs according to the section 2-3. 

2)

 

Connect the output wires of each UPS to an output breaker. 

3)

 

Connect  all  output  breakers  to  a  major  output  breaker.  Then  this  major  output  breaker  will  directly 
connect to the loads. 

4)

 

Each UPS is connected to an independent battery pack. 

NOTE: 

The parallel system can not use one battery pack. Otherwise, it will cause system permanent failure. 

5)

 

Refer to the following wiring diagram: 

Summary of Contents for Proline 3/1 10K

Page 1: ...FSP Proline 3 1 3 1 10K 30K Online UPS Uninterruptible Power Supply System Version 1 6 User Manual ...

Page 2: ... the package and check the package contents The shipping package contains One UPS One user manual One monitoring software CD One RS 232 cable option One USB cable One parallel cable only available for parallel model One share current cable only available for parallel model One battery cable only available for 10KL NOTE Before installation please inspect the unit Be sure that nothing inside the pac...

Page 3: ...5 Diagram 3 15K 20K Rear Panel Diagram 5 15KL 20KL Input Output Terminal Diagram 6 15K 20K Input Output Terminal Diagram 7 15K 20K Grounding Terminal Diagram 4 10K 10KL Input Output Terminal ...

Page 4: ...6 Diagram 8 30KL rear panel Diagram 9 30K rear panel Diagram 10 30K L input output terminal ...

Page 5: ...current port only available for parallel model 5 Parallel port only available for parallel model 6 Intelligent slot 7 Maintenance bypass switch 8 External maintenance bypass switch port 9 Line input circuit breaker 10 Output circuit breaker for receptacles 11 Output receptacles connect to mission critical loads 12 Input Output terminal Refer to Diagram 4 5 6 7 10 12 and 14 for the details 13 Outpu...

Page 6: ...table Model Wiring spec AWG Input Output Battery Ground 10K 8 8 8 10KL 8 8 8 8 15K 6 6 6 15KL 6 6 6 6 20K 6 6 6 20KL 6 6 6 6 30K 4 4 4 30KL 4 4 4 4 NOTE 1 The cable for 10K 10KL should be able to withstand over 63A current It is recommended to use 8AWG or thicker wire for safety and efficiency NOTE 2 The cable for 15K 15KL should be able to withstand over 75A current It is recommended to use 6AWG ...

Page 7: ...9 Terminal Block wiring diagram of 10K 10KL Terminal Block wiring diagram of 15KL 20KL Terminal Block wiring diagram of 15K 20K ...

Page 8: ...rminal Please connect non critical devices to the programmable terminal and critical devices to the output terminal outlets During power failure you may extend the backup time to critical devices by setting shorter backup time for non critical devices NOTE 3 Please install the output breaker between the output terminal and the load and the breaker should be qualified with leakage current protectiv...

Page 9: ...terminal block and make sure the correct battery polarity is connected Wrong connection may cause permanent damage of the UPS Make sure the protective earth ground wiring is correct The wire current spec color position connection and conductance reliability should be checked carefully Make sure the utility input output wiring is correct The wire current spec color position connection and conductan...

Page 10: ...12 Wiring diagram of parallel system for 10K 10KL ...

Page 11: ...13 Wiring diagram of parallel system for 15K L 20K L ...

Page 12: ...14 Wiring diagram of parallel system for 30K ...

Page 13: ...lel system for 15KR L 20KR L S h a r e c u r r e n t c a b l e c o n n e c t i o n P a r a l l e l c o m m u n i c a t i o n p o r t c o n n e c t i o n S h a r e c u r r e n t c a b l e c o n n e c t i o n P a r a l l e l c o m m u n i c a t i o n p o r t c o n n e c t i o n ...

Page 14: ...stable 2 x 20 18 20 adjustable 2 x 20 18 20 adjustable 3 x 20 18 20 adjustable Recharge Time 9 hours recover to 90 capacity Charging Current 1 0 A 10 max 2 0 A 10 max 2 0 A 10 max 4 0 A 10 max Charging Voltage 273 V 1 Based on 20pcs batteries Long run Model Type Depending on applications Numbers 18 20 Charging Current 4 0 A 10 max 8 0 A 10 max 8 0 A 10 max 12 0 A 10 max Charging Voltage 273 V 1 Ba...

Page 15: ...able Recharge Time 9 hours recover to 90 capacity Charging Current 1 0 A 10 max 2 0 A 10 max 2 0 A 10 max Charging Voltage 273 V 1 Based on 20pcs batteries Long run Model Type Depending on applications Numbers 18 20 Charging Current 4 0 A 10 max 4 0 A 10 max 4 0 A 10 max Charging Voltage 273 V 1 Based on 20pcs batteries PHYSICAL Standard Model Dimension D X W X H UPS 668 x 438 x 133 3U Battery pac...

Reviews: