7
■
Step 8.
1.
Install the Handrail Support (15) between the Upright Tubes (5,4) with the 4pcs of 5/16”x
3/4” Button Head Socket Bolts (151).
2.
Put the Beverage Holder (150) on the Handrail Support (15).
150
NOTE: Please Tighten All Screws After All Components Assembly Complete.