Manual_FCS-C1000_V1.1_EN
15
STEP 5:
Connect the output of the hydrogen supply valve to the stack (pay attention to the arrow direction on
the valve). The hydrogen supply valve will prevent damage from the hydrogen while the stack is off.
Pay attention to the direction of the connection of the Hydrogen supply valve.
The
finished
connection is shown in 5H.
5A
5B
5C
5D
5E
5G
Warning: The tube between the hydrogen pressure regulator and the fuel cell gas input is
required to be less than 30cm.
Summary of Contents for H-1000
Page 4: ...Manual_FCS C1000_V1 1_EN 1 1 Safety ...
Page 5: ...Manual_FCS C1000_V1 1_EN 2 ...
Page 6: ...Manual_FCS C1000_V1 1_EN 3 ...
Page 7: ...Manual_FCS C1000_V1 1_EN 4 ...
Page 12: ...Manual_FCS C1000_V1 1_EN 9 ...
Page 13: ...Manual_FCS C1000_V1 1_EN 10 ...
Page 14: ...Manual_FCS C1000_V1 1_EN 11 4 Technical Specification ...
Page 24: ...Manual_FCS C1000_V1 1_EN 21 7 System setup diagram SCU Short Circuit Unit GND Grounding ...
Page 26: ...Manual_FCS C1000_V1 1_EN 23 ...
Page 27: ...Manual_FCS C1000_V1 1_EN 24 ...
Page 31: ...Manual_FCS C1000_V1 1_EN 28 ...
Page 34: ...Manual_FCS C1000_V1 1_EN 31 12 Fuel Cell Drawing ...