Manual_FCS-C1000_V1.1_EN
22
8. Operating Procedures
STARTUP PROCEDURE
Make sure both the stack and the ambient temperature are less than 45
℃
. Otherwise the system
will not start up successfully.
Hold the ON/OFF button down for 2 seconds to start the system; you will hear one beep, which
means the system has started.
If at this time the system shuts down in less than 1 second, then review the "beeping interpretation
during starting procedure".
Once the system has started, you will hear a 3 seconds long purge from the purging valve, this is
the initial hydrogen going through the fuel cell to clear any non-Hydrogen gas from the system. If
you do not hear the hissing from the purge valve review
“Checking the Valve” in Troubleshooting.
Following the purging the fuel cell will short circuit 5 times over a 10 seconds period.
Summary of Contents for H-1000
Page 4: ...Manual_FCS C1000_V1 1_EN 1 1 Safety ...
Page 5: ...Manual_FCS C1000_V1 1_EN 2 ...
Page 6: ...Manual_FCS C1000_V1 1_EN 3 ...
Page 7: ...Manual_FCS C1000_V1 1_EN 4 ...
Page 12: ...Manual_FCS C1000_V1 1_EN 9 ...
Page 13: ...Manual_FCS C1000_V1 1_EN 10 ...
Page 14: ...Manual_FCS C1000_V1 1_EN 11 4 Technical Specification ...
Page 24: ...Manual_FCS C1000_V1 1_EN 21 7 System setup diagram SCU Short Circuit Unit GND Grounding ...
Page 26: ...Manual_FCS C1000_V1 1_EN 23 ...
Page 27: ...Manual_FCS C1000_V1 1_EN 24 ...
Page 31: ...Manual_FCS C1000_V1 1_EN 28 ...
Page 34: ...Manual_FCS C1000_V1 1_EN 31 12 Fuel Cell Drawing ...