7
Chapter3 Installation
3-1 Confirmation
Confirm there are all accessories after opening packing, and is no damage
in the UPS and the accessory. Confirm a list of this content of packing in
the user's guide opening and an actual accessory.
Keep the packing box and the transport document when it seems that
damage was received while UPS is transported. And contact your survice.
3-2 Place
UPS is designed for the room. Choose the comforting place to be an
installation. Set up the device in a flat place. Especially, Avoid the
following places.
・Outdoor
・Place of direct sunshine
・Place of high temperature and humidity(Recommendation: 10-25℃)
・Place of strong vibration and strong impact
・Place where salinity and causticity gas are generated
・Sealing room
・Place with inclination
・Near wireless
・Place where a lot of dust exists
Keep the following space when you set up UPS.
Set up CRT display 30cm or more apart from this devices, because UPS
might give the influence such as shakes against CRT
This device does the forced air cooling.。Therefore, the space of 20cm or
more is each front side/rear side necessary. Moreover, the maintenance
work is done on the front side and rear side. The space of 2m or more is
necessary for the front side/rear side.
Summary of Contents for PEN102J1C
Page 8: ...1 1kVA 1 5kVA VII...
Page 9: ...VIII 2 4kVA...
Page 10: ...3kVA IX...
Page 11: ...Tower Type The attention label becomes it as follows 1kVA X...
Page 19: ......
Page 27: ...8 Figure 1 Need Space...
Page 84: ......
Page 85: ......