6. Do the slide and put UPS and EBM on the rail.
Fix the flange of UPS to the frame of the rack to fix UPS to the rack.
Advance toward clause 3-3-3 3-3-5 to complete the installation.
<= UPS
<= EBM
<= EBM
Figure 3-3 Installation of Rackmount (used EBM)
Installation of Tower type
When UPS is set up in the tower, the pedestal (plinth) for the tower
installation is installed in the bottom of the main flame.
1. The pedestal for the tower installation is assembled.
2. Slowly put UPS on the pedestal, and put UPS on a flat, horizontal
place.
NG
Figure 3-4 Installation of Tower
Attention
・Install the bracket when you add EBM.
・Position the air-intake vent in the upper part at the Tower installation.
!
~