11
3. Fix the pedestal of EBM between pedestal of UPS when you set up
EBM.
4. Slowly put UPS and EBM on the pedestal, and put on a flat, horizontal
place.
5. Fix UPS and EBM with a bracket like Figure 3-5.
6. In addition, repeat step 5 from step 3 when you add one EBM
another.
Figure 3-5 Installation of Tower (used EBM)
・Change the EBM connection number setting in clause 6-1-1 when you use
EBM. The predictive value at actual electrical discharge time and the electrical
discharge time is influenced when not normally set.
・Match in the operation form and set "Shutdown timing" of Power ー sol when
EBM and power management software (Power-sol) is additionally used. When
"Power-sol" is used like the factory setting, the backup time expected might not
be able to be kept.
・The recommendation of pedestal intervals is 300mm(3kVA is 350mm). Please
set it up so that pedestal may become symmetry for UPS.
3-3-2 Tower type Installation
Put tower type UPS on a flat, horizontal place.
Attention
・Otherwise, this device might fall, and it injure.
UPS PEDESTAL
SHORT SCREW
BRACKET
EBM
UPS
EBM PESDESTAL
UPS
NO.2 EBM
SHORT SCREW
BRACKET
NO.1 EBM
EBM PEDESTAL
!
Summary of Contents for PEN102J1C
Page 8: ...1 1kVA 1 5kVA VII...
Page 9: ...VIII 2 4kVA...
Page 10: ...3kVA IX...
Page 11: ...Tower Type The attention label becomes it as follows 1kVA X...
Page 19: ......
Page 27: ...8 Figure 1 Need Space...
Page 84: ......
Page 85: ......