Installation Procedure for H-20, HS-20
with Support Columns Checklist cont.
Fuji Clean USA ● 41-2 Greenwood Road ● Brunswick Maine 04011 ● Tel: 207-406-2927 ● Fax: 207-406-2929 ●
www.fujicleanusa.com
Step 8 continued:
Alarm Panel shall be:
in a well ventilated area as dry and protected from elements as possible
in as close of proximity to FujiMAC air blower as possible
wired by licensed electrician
in a location that allows unencumbered access for inspection and maintenance activity
Step 9: For cold climate installations, please install insulated risers and covers and cover upper half of
treatment unit with min. R-8 value insulating material (i.e. foam board)
Step 10: Float switch electrical cord connect through a male adaptor (caulked watertight to prevent septic
gas leakage) or watertight fitting. An interior connection to direct burial cable is also an acceptable option.
Step 11: Backfill up to under slab level. Make sure to compact tightly.
Step 12: Set access covers and rebar arrangement for top slab. Concrete work and cure concrete until
hardened. During final landscaping, seeding etc., be sure to pitch final grade away from covers to sweep
surface water away from treatment tank.
Step 13: Complete Warranty Activation Card.
Step 14: Finalize Controller Wiring. Please have licensed electrician refer to wiring diagram (in Installer
Manual and enclosed separately in alarm/control panel). Upgraded Fuji Clean USA controllers are available
if telecommunications, elapsed time meter, data logging or other functions are required. Please contact Fuji
Clean USA for details.
Step 15: Follow start-up procedure detailed in Installation Manual:
□
1. Outside Environment Check
□
2. Blower Box Check
□
3. Blower Operation and Blower Alarm Check
□
4. Water Level is at Low Water Level
□
5. High Water Float Switch Check
□
6. Set Recirculation Control Valve. (gray)
□
7. Check Recirculation Flow Rate
□
8. Check/Set Aeration Balance Control Valve (blue)
□
9. Check/Set Effluent Airlift Valve (white)
□
10. Check Effluent Airlift Pipe
□
11. Add Disinfectant Tablets to Chlorinator (if appropriate)
□
12. Check Alarm/Control Panel and Air blower
□
13. Final Site Preparation
□
14. Owner Communication - Service Provider and Warranty Delivery
47