70S+A_Rev1
38
Basic Operation
Using Fiber Holder
1.
Remove a screw beside sheath clamps and take the sheath clamps off the
splicer.
2.
Place fiber holders so that the guide pins on the stage go to guide-holes in the fiber.
3.
Wind-protector is closed automatically. The splicer starts the splice procedure
automatically.
The prolonged storage back and when splicing for the first time, we recommend you
execute for an Arc Calibration.
Refer to [Arc Calibration].
Be careful not to contact the prepared fiber tips into anything to maintain fiber
end-face quality.