70S_Rev1
33
Basic Operation
Using Fiber Holder
1.
Loosen a screw beside sheathe clamps and take the sheathe clamps off the
splicer.
2.
Place fiber holders so that the guide pins on the stage go to guide-holes in the
fiber.
3.
Wind-protector is closed automatically. The splicer starts the splice procedure
automatically.
The prolonged storage back and when splicing for the first time, we recommend
you execute for an Arc Calibration.
Refer to [Arc Calibration].
Be careful not to contact the prepared fiber tips into anything to maintain fiber
end-face quality.