CHAPTER 3
Small Configuration
Connecting and Checking Office Battery to the CBP
3-33
FLASHWAVE 7500 Release 6.1
Equipment Installation
Fujitsu and Fujitsu Customer Use Only
FNC-7500-0061-200
Issue 1, May 2009
3.7.2
Checking Battery Voltage at Circuit Breaker Panel
Note:
In this procedure, the term
battery
refers to the DC power feed for the rack in which the
equipment is being mounted.
Note:
This procedure assumes that power cables have been connected between the office battery and
the CBP and that the battery power is on.
The test equipment required is a DMM (digital multimeter).
Step
Task
1
Set the DMM switches to measure voltage between 40 and 60 V DC.
2
On the front panel of the CBP, set all circuit breakers to the ON position.
3
Connect the negative DMM test lead to the first GND connector on the front panel, and
connect the positive DMM test lead to the associated input voltage test point (–48 V) on the
front of the CBP. See
The input voltage should be between –40 and –57 V DC.
4
Is the DMM measurement between –40 and –57 V DC?
If YES:
If NO:
Report trouble to the installation group. When trouble is corrected, repeat
.
5
Disconnect the DMM leads.
6
Repeat
for each applicable –48 V/GND pair.
7
On the CBP front panel, set all circuit breakers to the OFF position.
This procedure is complete.
Revision 1, June 2009
Summary of Contents for FLASHWAVE 7500
Page 8: ...Revision 1 June 2009 ...
Page 10: ...Revision 1 June 2009 ...
Page 16: ...Revision 1 June 2009 ...
Page 362: ...Revision 1 June 2009 ...
Page 386: ...Revision 1 June 2009 ...