CHAPTER 4
ETSI Configuration
Installing the Rack
4-17
FLASHWAVE 7500 Release 6.1
Equipment Installation
Fujitsu and Fujitsu Customer Use Only
FNC-7500-0061-200
Issue 1, May 2009
9
Install an anchor in each of the holes.
10
Remove any debris from the area in which the rack will be mounted.
11
Move the rack into position, aligning each of the holes in the base of the rack to the anchors.
12
Install the mounting bolts into the anchors, and tighten them to within 12.7 mm (0.5 inch)
of the equipment rack baseplate. Do not fully tighten at this time.
13
14
Drill the holes in the raised floor in accordance with the dimensions of the mounting bolts
being used.
15
Remove any debris from the area in which the rack will be mounted.
16
Move the rack into position, aligning each of the holes in the base of the rack to the anchors.
17
Install the mounting bolts with lock washers through the equipment rack baseplate and the
raised floor.
18
Install the nuts to the bolts under the raised floor. Tighten them until the lock washers begin
to compress, but do not fully tighten them now.
19
Secure the top of the equipment rack according to the job specifications. Some equipment
racks are secured to existing overhead framework, while others are secured to an adjacent wall
using a horizontal mounting brace. All overhead mounting hardware should be tightened
after assembly.
20
Tighten the floor mounting bolts.
Note:
If the rack is installed on a raised floor, there will likely be some type of supports needed.
Instructions for seismic zone installation must also be considered. Follow your local practices for
support and bracing of the rack.
21
Measure the vertical alignment of the 2200 mm (86.6 inches) equipment rack. Ensure vertical
alignment is within 4.76 mm (0.1875 inches).
Revision 1, June 2009
Summary of Contents for FLASHWAVE 7500
Page 8: ...Revision 1 June 2009 ...
Page 10: ...Revision 1 June 2009 ...
Page 16: ...Revision 1 June 2009 ...
Page 362: ...Revision 1 June 2009 ...
Page 386: ...Revision 1 June 2009 ...