A
B
C
90 mm (3.5 in)
Figure
5-10
Connecting
the
link
cables
and
management
cable
(SPARC
M10-1
side)
3.
If
a
PCIe
card
is
mounted,
connect
a
LAN
cable
and
I/O
cable
to
the
respective
ports
on
the
PCIe
card.
4.
Secure
the
cables
to
the
cable
support.
While
leaving
extra
length,
secure
the
cables
connected
to
the
PCIe
card
to
the
cable
support.
5.
Attach
a
core
to
each
supplied
power
cord,
and
connect
the
cord
to
a
power
supply
unit.
a.
Insert
the
power
cord
so
that
it
fits
into
the
groove
of
the
core.
Pinch
the
core
closed
until
its
latch
is
secured.
Attach
the
core
at
a
location
90
mm
(3.5
in)
from
the
end
of
the
power
cord
connector.
(See
b.
Connect
the
power
cord
to
the
power
supply
unit
(A
in
).
Secure
the
power
cords
with
a
power
clamp.
Figure
5-11
Core
attachment
location
Fujitsu
M10/SPARC
M10
Systems
Installation
Guide
・
July
2015
170
Summary of Contents for M10 Series
Page 1: ...Fujitsu M10 SPARC M10 Systems Installation Guide Manual Code C120 E678 12EN July 2015 ...
Page 10: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 x ...
Page 156: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 142 ...
Page 176: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 162 ...
Page 208: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 194 ...
Page 240: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 226 ...
Page 252: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 238 ...
Page 290: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 276 ...
Page 310: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 296 ...
Page 336: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 322 ...
Page 368: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 354 ...
Page 374: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 360 ...