Note
-
If
the
system
will
be
used
in
a
region
where
an
appropriate
input
power
outlet
is
not
available,
contact
a
certified
electrician.
Have
the
electrician
remove
the
connectors
from
each
power
cord
and
connect
the
power
cord
to
a
dedicated
branch
circuit.
Check
the
electrical
regulations
of
the
region
about
installation
conditions.
Note
-
The
values
listed
in
are
based
on
values
for
the
maximum
configuration
of
each
chassis.
The
actual
values
vary
depending
on
the
system
configuration.
Table
2-10
Electrical
specifications
(SPARC
M10-1)
Item
Specification
Input
voltage
of
100
to
120
VAC
Input
voltage
of
200
to
240
VAC
CPU
type:
SPARC64
X
CPU
type:
SPARC64
X+
CPU
type:
SPARC64
X
CPU
type:
SPARC64
X+
Number
of
power
cords
2
(1
for
each
PSU)
2
(1
for
each
PSU)
Power
cord
length
Maximum
length
of
3.0
m
(9.8
ft.)
Maximum
length
of
3.0
m
(9.8
ft.)
Redundancy
1+1
redundant
configuration
1+1
redundant
configuration
Frequency
50
Hz/60
Hz,
single
phase
50
Hz/60
Hz,
single
phase
2.9
Preparing
Power
Supply
Facilities
This
section
describes
the
electrical
specifications,
power
cord
specifications,
facility
power
requirements,
and
grounding
requirements
of
the
SPARC
M10
systems.
To
minimize
component
failure
rates,
stable
power
supply
such
as
with
a
dual
power
feed
or
uninterruptible
power
supply
(UPS)
must
be
prepared.
The
component
failure
rate
is
likely
to
be
higher
when
the
system
operates
in
an
environment
with
frequent
power
outages
or
unstable
power
supply
than
in
an
environment
where
the
supply
of
power
is
stable.
Electrical
work
and
installation
must
be
performed
in
accordance
with
the
electrical
regulations
of
the
region,
municipality,
or
country.
2.9.1
Electrical
specifications
to
list
the
electrical
specifications
of
each
chassis.
Memory
devices
of
64
GB
are
currently
available
only
in
Japan.
Separate
electrical
specifications
are
shown
for
Japan
and
for
outside
Japan
because
their
maximum
configurations
are
different.
Fujitsu
M10/SPARC
M10
Systems
Installation
Guide
・
July
2015
54
Summary of Contents for M10 Series
Page 1: ...Fujitsu M10 SPARC M10 Systems Installation Guide Manual Code C120 E678 12EN July 2015 ...
Page 10: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 x ...
Page 156: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 142 ...
Page 176: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 162 ...
Page 208: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 194 ...
Page 240: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 226 ...
Page 252: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 238 ...
Page 290: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 276 ...
Page 310: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 296 ...
Page 336: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 322 ...
Page 368: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 354 ...
Page 374: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 360 ...