BB15
BB14
BB13
BB12
XB83
XB82
BB11
BB10
BB09
BB08
BB07
BB06
BB05
BB04
XB81
XB80
BB03
BB02
BB01
BB00
Expansion rack 2
Expansion rack 1
REAR
Figure
4-15
Cable
laying
diagram
3.
Connect
the
crossbar
cables
to
crossbar
boxes.
The
crossbar
cables
are
laid
in
a
bundle
for
each
chassis.
Connect
cables
without
changing
how
they
are
laid.
Connect
the
cables
such
that
the
port
indications
on
each
chassis
match
the
labels
on
the
cables.
There
are
two
ports
with
the
same
port
number.
Each
port
on
the
chassis
is
color-coded.
Connect
the
port
to
the
corresponding
port
of
the
same
color.
Hold
the
connector
of
the
crossbar
cable
(optical),
and
insert
it
straight
into
the
opening.
Do
not
hold
the
cable
when
inserting
it.
Fujitsu
M10/SPARC
M10
Systems
Installation
Guide
・
July
2015
156
Summary of Contents for M10 Series
Page 1: ...Fujitsu M10 SPARC M10 Systems Installation Guide Manual Code C120 E678 12EN July 2015 ...
Page 10: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 x ...
Page 156: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 142 ...
Page 176: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 162 ...
Page 208: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 194 ...
Page 240: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 226 ...
Page 252: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 238 ...
Page 290: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 276 ...
Page 310: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 296 ...
Page 336: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 322 ...
Page 368: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 354 ...
Page 374: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 360 ...