11
1.9 Power-on Debug Specifications
1.9
Power-on Debug Specifications
The emulator has a power-on debug function that executes a program immediately
after the evaluation MCU is powered on.
■
Power-on Debug Specifications
Power-on debug(*1) is a function using the reset terminal(*2) of the evaluation MCU to verify
execution of a program immediately after the power-on sequence.
Before the power-on debug function can be used, related operations must be completed to
prepare it.
For information on such operations, see the
Softune Workbench Operation Manual
.
*1 The evaluation MCU must be compatible with the power-on debug function. For more
information, contact the Fujitsu Sales Dept. or Support Dept.
*2 The name of the reset terminal may depend on the model of the evaluation MCU. For
more information, contact the Fujitsu Sales Dept. or Support Dept.
■
Operation Flow
Figure 1.9-1 "Power-on Debug Operation Flow" shows the flow of the power-on debug
operation.
Figure 1.9-1 Power-on Debug Operation Flow
- Enable the power-on debug function.
- Set the power-off detection level.
A program is executed.
User system power is turned off.
UVCC LED goes off.
An evaluation MCU reset is output.
Has the user system
power been turned on?
UVCC LED goes on.
Has the operation stabilization
time elapsed?
Enable a user system reset.
A program is executed.
Summary of Contents for MB2147-01
Page 10: ......
Page 11: ...FUJITSU LIMITED DSU FR EMULATOR MB2198 01 HARDWARE MANUAL ...
Page 12: ......
Page 20: ...viii ...
Page 22: ...x ...
Page 56: ...34 CHAPTER 2 CONNECTION METHOD ...
Page 64: ...42 CHAPTER 3 OPERATION METHOD ...
Page 66: ......
Page 76: ...54 APPENDIX B User System Specifications ...
Page 78: ......
Page 92: ......