7.8 Bus Sequence
C156-E228-02EN 7-45
7.8 Bus Sequence
SCSI bus phases are switched in the specified sequence according to the command
operation executed in the TARG. After a TARG has asserted the BSY signal in
the SELECTION or RESELECTION phase, the bus phase sequence other than
ATTENTION condition and RESET condition is controlled by the TARG.
All bus phases can be aborted through the RESET condition so that the BUS
FREE phase is always created. Also, any other phase can be followed by the BUS
FREE phase.
Note:
The TARG can enter the BUS FREE phase in order to report an error
condition. For details, see Subsection 7.6.1.
Figure 7.21 shows the allowable bus phase sequence applied to systems without
the ARBITRATION phase and systems with the ARBITRATION phase. Figure
7.22 provides an example of bus phase sequence during single command
execution.
the ARBITRATION phase, systems with the ARBITRATION
phase, systems with the MESSAGE OUT phase, and systems
without the MESSAGE OUT phase. The generation of the
ATTENTION condition determines whether or not systems use the
MESSAGE OUT phase. If the ATTENTION condition is not
generated, the TARG assumes that the INIT is supporting only a
COMMAND COMPLETE message and the TARG operates so that
it will not use other messages in the subsequent command execution
sequence. The ATN signal status is ignored; therefore, the TARG
does not enter the MESSAGE OUT phase.
Summary of Contents for MCM3064SS
Page 1: ...C156 E228 02EN MCM3064SS MCM3130SS MCP3064SS MCP3130SS OPTICAL DISK DRIVES PRODUCT MANUAL ...
Page 4: ...This page is intentionally left blank ...
Page 8: ...This page is intentionally left blank ...
Page 20: ...This page is intentionally left blank ...
Page 30: ...This page is intentionally left blank ...
Page 42: ...Specifications 2 12 C156 E228 02EN Figure 2 3 Example of alternate processing ...
Page 47: ...3 2 Mounting Requirements C156 E228 02EN 3 5 Figure 3 2 Outer dimensions 1 of 2 ...
Page 49: ...3 2 Mounting Requirements C156 E228 02EN 3 7 Figure 3 3 Outer dimensions 1 of 3 ...
Page 51: ...3 2 Mounting Requirements C156 E228 02EN 3 9 Figure 3 3 Outer dimensions 3 of 3 ...
Page 82: ...Installation 4 16 C156 E228 02EN Figure 4 6 SCSI connection check ...
Page 84: ...This page is intentionally left blank ...
Page 98: ...This page is intentionally left blank ...
Page 148: ...SCSI BUS 7 46 C156 E228 02EN Figure 7 21 Bus phase sequence 1 of 2 ...
Page 149: ...7 8 Bus Sequence C156 E228 02EN 7 47 Figure 7 21 Bus phase sequence 2 of 2 ...
Page 158: ...This page is intentionally left blank ...
Page 166: ...This page is intentionally left blank ...
Page 168: ...This page is intentionally left blank ...
Page 169: ......
Page 170: ......