System Configuration Guide
PRIMEQUEST 2800B3
PRIMEQUEST 2800B3
System Configuration Guide
Contents
1.
Overview
2.
Base Unit
3.
System Board (SB)
4.
CPU
5.
Memory
6.
I/O Unit
7.
Disk Unit (DU)
8.
HDD/SSD in Disk Unit
9.
PSU for Base Unit, Power Cord for Base Unit
10.
PCI Card
11.
Rack Installation
12.
Maximum Quantity of PCIe Cards
13.
Available OS
Change Report
July 2017
FUJITSU Server PRIMEQUEST
1 / 28