FC Switch Blade
FC switch blade installation
Configuration with a combination of 2-way server blades and 4-way server
blades
The illustration below shows the assignment of FC switch blades to the fabric
ports of the server blades in a configuration with two 4-way server blades and
six 2-way server blades.
Figure 63: Fabric port assignment with 4-way and 2-way server blades
I
When using the 12-port version the fabric ports of the 2-way server
blades 3 and 4 (slots 9 and 10) are not available.
10.3
FC switch blade installation
V
CAUTION
●
FC switch blades must always be installed in slot NET3 first (see
page 108
).
The installation and removal of FC switch blades takes place in the same way
as the installation of fibre channel pass-thru blades (see
page 121
).
2-w
a
y
A B A B A B A B A B A B A B A B A B A B
FC switch blade NET3
FC switch blade NET4
4-way
Server
Blade 1
4-way
Server
Blade 2
S
e
rv
er b
lade 1
2-
w
a
y
Ser
v
er
b
lade 2
2-
w
a
y
Ser
v
er
b
lade 3
2-
w
a
y
Ser
v
er
b
lade 4
2-w
a
y
S
e
rv
er b
lade 5
2-w
a
y
S
e
rv
er b
lade 6