26
Upgrade and Maintenance Manual
BX920
S4
Before you start
©
c
o
gn
ita
s.
G
e
se
lls
ch
ft fü
r T
ech
n
ik
-D
o
ku
m
en
ta
tio
n
m
b
H
2
0
14
Pf
a
d:
C
:\P
ro
g
ra
m
m
e
\F
C
T
\ti
m
_a
pp
\ti
m
_l
oca
l\w
or
k\PI
C
H
O
L\
O
B
J_
D
O
KU
-1
9
86
5-
00
1.
fm
2.2
Average task duration
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
Refer to
for an overview of steps taken into account for
calculating the average task duration:
Average task duration: 10 minutes
Step
included
Explanation
Server shutdown
no
Shutdown time depends on hardware and
software configuration and may vary
significantly.
Software tasks necessary before
maintenance are described in section
"Starting the maintenance task" on
page 63
System unit
removal,
disassembly
yes
Making the server blade available,
removing the server blade from the system
unit
Transport
no
Transporting the server blade to the service
table (where required) depends on local
customer conditions.
Maintenance
procedures
yes
Maintenance procedures including
preliminary and concluding software tasks
Transport
no
Returning the server blade to its installation
site (where required) depends on local
customer conditions.
Assembly, system
unit installation
yes
Reassembling the server blade, installing
the server blade in the system unit
Starting up
no
Booting time depends on hardware and
software configuration and may vary
significantly.
Table 1: Calculation of the average task duration