BX920 S4
Upgrade and Maintenance Manual
139
Expansion cards and backup units
7.1.3.4
Concluding steps
Perform the following procedures to complete the task:
Ê
Close the server blade as described in section
.
Ê
Reinstall and secure the server blade in the system unit as described in
section
"Installing the server blade in the system unit" on page 58
.
Ê
If applicable, close the rack door as described in section
Ê
In order to configure a mezzanine card that has been installed or replaced,
the card’s Option ROM has to be enabled in the system board BIOS. For
SAN / iSCSI boot the card's Option ROM has to be enabled permanently. If
applicable, proceed as described in section
.
Ê
Enable boot watchdog functionality as described in section
watchdog functionality" on page 86
.
Ê
If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section
BitLocker functionality" on page 93
Ê
If applicable, restore LAN teaming configurations as described in section
"After replacing / upgrading LAN/CNA controllers" on page 96
.