BX924 S3
Upgrade and Maintenance Manual
275
System board components
Figure 122: Installing the system board (B)
Ê
Secure the system board with the screw (M3 x 6 mm, C26192-Y10-C68)
(see circle).
I
Screw torque: 0.6 Nm (not applicable for the Japanese market)
Ê
Verify the settings on the new system board (jumpers and/or switch).
I
For a detailed description, please refer to section
"Onboard settings"
on page 283
.
10.5.5 Concluding steps
Ê
If applicable, reinstall the air cowls as described in section
"Installing the air
cowls" on page 178
.
Ê
Reinstall all remaining system board components as shown in the related
sections:
– Mezzanine cards with carrier: refer to section
"Installing mezzanine
cards" on page 142
I
Install all expansion cards into their original slots.
– TPM (if applicable): refer to section
section "Installing the TPM" on
page 251
Summary of Contents for PRIMERGY BX924 S3
Page 6: ...Upgrade and Maintenance Manual BX924 S3 ...
Page 16: ...16 Upgrade and Maintenance Manual BX924 S3 ...
Page 20: ...20 Upgrade and Maintenance Manual BX924 S3 Introduction ...
Page 42: ...42 Upgrade and Maintenance Manual BX924 S3 Important information ...
Page 68: ...68 Upgrade and Maintenance Manual BX924 S3 Basic hardware procedures ...
Page 104: ...104 Upgrade and Maintenance Manual BX924 S3 Basic software procedures ...
Page 180: ...180 Upgrade and Maintenance Manual BX924 S3 Main memory ...
Page 232: ...232 Upgrade and Maintenance Manual BX924 S3 Processors ...
Page 278: ...278 Upgrade and Maintenance Manual BX924 S3 System board components ...