110
Upgrade and Maintenance Manual
CX270
S2
Expansion cards, interposer boards and battery backup units
Ê
"Installing the server node in the server enclosure" on page 62
Ê
"Switching on the server node" on page 63
6.3.3
Replacing expansion cards
Note on network settings recovery
I
When replacing network controllers or the system board, network
configuration settings in the operating system will be lost and replaced
by default values. This applies to all static IP address and LAN teaming
configurations.
Ensure to note down your current network settings before replacing a
controller or the system board.
6.3.3.1
Required tools
●
Preliminary and concluding steps:
– Phillips PH2 / (+) No. 2 screw driver
●
Replacing expansion cards:
– Phillips PH2 / (+) No. 2 screw driver
6.3.3.2
Preliminary steps
Perform the following steps:
Ê
Locate the desired server node with the ID button.
Ê
"Shutting down the server node" on page 43
Ê
Remove all external cables from the server node.
Upgrade and Repair Units (URU)
Average hardware task duration: 5 minutes
Average software task duration: 5 minutes