58
Operating Manual
CX400 M4
Starting up
– The server enclosure weighs more than 21 kg and is installed above
the height of 25 U.
When using a lifter, this removal procedure needs to be carried out by
maintenance personnel.
Figure 24: Removing the server enclosure out of the rack (A)
Ê
While pressing the locking levers (1) on both sides of the enclosure use the
brackets (2) to pull the server enclosure out of its lock.
Summary of Contents for PRIMERGY CX400 M4
Page 6: ...Operating Manual CX400 M4 ...
Page 10: ...10 Operating Manual CX400 M4 Introduction ...
Page 14: ...14 Operating Manual CX400 M4 Before you start ...
Page 42: ...42 Operating Manual CX400 M4 Important information ...
Page 74: ...74 Operating Manual CX400 M4 Operation ...
Page 82: ...82 Operating Manual CX400 M4 Technical data ...
Page 84: ...84 Bearbeitungsstand Bestellnummer Warranty and service ...