CX400 M4
Operating Manual
69
Operation
6.4
Installing a server node
6.4.1
Removing the server node dummy module
I
The CX400 M4 system must always run with closed node bays. It is only
allowed to leave a bay open for a limited time in case of repairing a server
node (for example). In the meantime all remaining server nodes run in
throttling mode (with reduced performance).
V
CAUTION!
●
Follow the safety instructions in the chapter
.
Figure 30: Removing the server node dummy module
Ê
Undo the locking mechanism (1) of the release lever and pull the server
node dummy module out of the bay (2).
6.4.2
Installing the CX2550 M4/M5 or CX2560 M4/M5
server node
V
CAUTION!
●
Follow the safety instructions in the chapter
.
Summary of Contents for PRIMERGY CX400 M4
Page 6: ...Operating Manual CX400 M4 ...
Page 10: ...10 Operating Manual CX400 M4 Introduction ...
Page 14: ...14 Operating Manual CX400 M4 Before you start ...
Page 42: ...42 Operating Manual CX400 M4 Important information ...
Page 74: ...74 Operating Manual CX400 M4 Operation ...
Page 82: ...82 Operating Manual CX400 M4 Technical data ...
Page 84: ...84 Bearbeitungsstand Bestellnummer Warranty and service ...