88
Upgrade and Maintenance Manual
CX400
S1
Power supply
6.5
Replacing the power distribution board
6.5.1
Replacing the defective top PDB
Note on system information
The top PDB contains the Chassis ID EPROM that contains system information
like server name and model, housing type, serial number and manufacturing
data.
6.5.1.1
Required tools
●
Preliminary and concluding steps:
– Phillips PH2 / (+) No. 2 screw driver
●
Main steps:
– Phillips PH2 / (+) No. 2 screw driver
6.5.1.2
Preliminary steps
Perform the following procedures:
Ê
"Shutting down the server node" on page 41
Ê
"Removing the server enclosure out of the rack" on page 43
V
CAUTION!
For ALL service tasks, remove the CX400 S1 server enclosure out of
the rack and put it on a separate desk!
Field Replaceable Units (FRU)
Average hardware task duration: 25 minutes
Average software task duration: 5 minutes
Summary of Contents for PRIMERGY CX400 S1
Page 12: ...12 Bearbeitungsstand Bestellnummer Content ...
Page 14: ...14 Upgrade and Maintenance Manual CX400 S1 Version history ...
Page 18: ...18 Upgrade and Maintenance Manual CX400 S1 Introduction ...
Page 76: ...76 Upgrade and Maintenance Manual CX400 S1 Basic hardware procedures ...
Page 132: ...132 Upgrade and Maintenance Manual CX400 S1 Hard disk drives solid state drives ...
Page 196: ...196 Upgrade and Maintenance Manual CX400 S1 Cabling 12 3 Cabling Figure 147 2 5 inch chassis ...
Page 197: ...CX400 S1 Upgrade and Maintenance Manual 197 Cabling Figure 148 3 5 inch chassis ...
Page 198: ...198 Upgrade and Maintenance Manual CX400 S1 Cabling ...