U41147-J-Z156-2-76
43
Preparation for use and operation
Switching the server on and off
Some of the system error messages which can appear on the LCD display are
described in the section “Error messages on the control panel” on page 58.
4.3
Switching the server on and off
V
CAUTION!
When after switching on the server there is nothing but flickering stripes
on the screen, switch the server off immediately (see in chapter “Trouble-
shooting and tips” the section “Flickering stripes on monitor screen” on
page 55).
The power switch does not disconnect the server from the line voltage.
To disconnect the line voltage completely, remove the power plug from
the grounded power outlet.
Ê
Set the key switch in the control panel to the Local position.
Server is switched off
Ê
Press the power switch.
The server switches on, performs a system test, and starts the operating
system.
I
Please note that the memory size displayed during the system test varies
according to the PCI slot equipment.
Server is switched on
Ê
Shut down the operating system in the usual manner.
Ê
Press the power switch.
The server switches off.
Summary of Contents for PRIMERGY H200
Page 4: ......
Page 5: ...Related publications and index ...
Page 6: ......
Page 10: ......
Page 18: ...8 U41147 J Z156 2 76 Technical data Introduction ...
Page 19: ...U41147 J Z156 2 76 9 Introduction Technical data ...
Page 20: ......
Page 21: ...U41147 J Z156 2 76 11 Introduction Technical data ...
Page 22: ...12 U41147 J Z156 2 76 Technical data Introduction ...
Page 32: ......
Page 71: ...U41147 J Z156 2 76 61 Troubleshooting and tips Error messages on the control panel ...
Page 72: ......
Page 100: ......
Page 140: ......
Page 142: ......
Page 150: ......
Page 152: ......
Page 154: ......