Figure 12: Installing the server in the rack rails
▶
Fully extend the rack rails until they lock in place (1).
The rack rails must click into place so that they can no longer be
moved.
▶
At a slight angle, lower the server onto the rear mounting point on the rack
rails (2).
▶
Fold down the server, while pressing the rail to the server side (3). Ensure
that all six rack mounting bolts are properly seated in the mounting points on
the rack rails and that the locking bars engage (4).
Basic hardware procedures
56
Upgrade and Maintenance Manual
RX1330 M5
Summary of Contents for PRIMERGY RX1330 M5
Page 68: ...Basic hardware procedures 68 Upgrade and Maintenance Manual RX1330 M5 ...
Page 118: ...Power supply unit PSU 118 Upgrade and Maintenance Manual RX1330 M5 ...
Page 178: ...Fans 178 Upgrade and Maintenance Manual RX1330 M5 ...
Page 230: ...Main memory 230 Upgrade and Maintenance Manual RX1330 M5 ...
Page 256: ...Accessible drives 256 Upgrade and Maintenance Manual RX1330 M5 ...
Page 282: ...Front panel 282 Upgrade and Maintenance Manual RX1330 M5 ...
Page 290: ...Serial interface 290 Upgrade and Maintenance Manual RX1330 M5 ...
Page 336: ...System board and components 336 Upgrade and Maintenance Manual RX1330 M5 ...
Page 362: ...Appendix A 362 Upgrade and Maintenance Manual RX1330 M5 ...
Page 403: ...14 RX1330M5S SERIAL ext Cable Plan CA05973 7065 PCIe SLOT2 System Board D3929 SERIAL ...
Page 405: ...List of all used screws for PRIMERGY Servers Assembled in WCZ and FIT June 2021 ...