▶
Pull the cable clamp up (1).
▶
Thread the power cord through the cable clamp (2).
▶
Press the cable clamp down until it engages to secure the cable (3).
It will take about 60 seconds until the server can be powered on.
4.8
Switching on the server
CAUTION
▶
Before switching on the server, make sure the top cover is closed.
In order to comply with applicable EMC regulations (regulations on
electromagnetic compatibility) and satisfy cooling requirements, the
server must not run while the top cover is removed.
▶
"Important information" on page 29
.
▶
Press the On/Off button to start up the server.
▶
Ensure that the power-on indicator is lit green.
Basic hardware procedures
60
Upgrade and Maintenance Manual
RX1330 M5
Summary of Contents for PRIMERGY RX1330 M5
Page 68: ...Basic hardware procedures 68 Upgrade and Maintenance Manual RX1330 M5 ...
Page 118: ...Power supply unit PSU 118 Upgrade and Maintenance Manual RX1330 M5 ...
Page 178: ...Fans 178 Upgrade and Maintenance Manual RX1330 M5 ...
Page 230: ...Main memory 230 Upgrade and Maintenance Manual RX1330 M5 ...
Page 256: ...Accessible drives 256 Upgrade and Maintenance Manual RX1330 M5 ...
Page 282: ...Front panel 282 Upgrade and Maintenance Manual RX1330 M5 ...
Page 290: ...Serial interface 290 Upgrade and Maintenance Manual RX1330 M5 ...
Page 336: ...System board and components 336 Upgrade and Maintenance Manual RX1330 M5 ...
Page 362: ...Appendix A 362 Upgrade and Maintenance Manual RX1330 M5 ...
Page 403: ...14 RX1330M5S SERIAL ext Cable Plan CA05973 7065 PCIe SLOT2 System Board D3929 SERIAL ...
Page 405: ...List of all used screws for PRIMERGY Servers Assembled in WCZ and FIT June 2021 ...