RX2520 M1
Upgrade and Maintenance Manual
233
Processors
11.2
Installing processors
V
CAUTION!
Processors are extremely sensitive to electrostatic discharge and must
be handled with care. After a processor has been removed from its
protective sleeve or from its socket, place it upside down on a
nonconducting, antistatic surface. Never push a processor over a
surface.
11.2.1 Preliminary steps
Ê
"Disabling or suspending BitLocker functionality" on page 67
Ê
"Disabling SVOM boot watchdog functionality" on page 68
Ê
"Shutting down the server" on page 51
Ê
"Disconnecting power cords" on page 52
Ê
"Getting access to the component" on page 53
.c
11.2.2 Installing the processor
I
This description applies to the following procedures:
– Installing the second CPU in a mono-processor configuration
– Transfering a CPU after replacing the system board (see section
"Swapping processors" on page 370
)
Upgrade and Repair Unit
(URU)
Hardware: 15 minutes
Software: 5 minutes
Tool:
Phillips PH2 / (+) No. 2 screw driver
Summary of Contents for PRIMERGY RX2520 M1
Page 36: ...36 Upgrade and Maintenance Manual RX2520 M1 Before you start ...
Page 120: ...120 Upgrade and Maintenance Manual RX2520 M1 Power supply units ...
Page 162: ...162 Upgrade and Maintenance Manual RX2520 M1 Hard disk drives solid state drives ...
Page 220: ...220 Upgrade and Maintenance Manual RX2520 M1 Expansion cards and backup units ...
Page 230: ...230 Upgrade and Maintenance Manual RX2520 M1 Main memory ...
Page 310: ...310 Upgrade and Maintenance Manual RX2520 M1 Accessible drives ...
Page 410: ...410 Upgrade and Maintenance Manual RX2520 M1 Cables ...