RX2530 M4
Upgrade and Maintenance Manual
29
Before you start
2.1.3 Field Replaceable Units (FRU)
Removing and installing Field Replaceable Units involves complex
maintenance procedures on integral server components. Procedures will
require shutting down, opening and disassembling the server.
V
CAUTION!
Maintenance procedures involving Field Replaceable Units must be
performed exclusively by Fujitsu service personnel or technicians trained
by Fujitsu. Please note that unauthorized interference with the system
will void the warranty and exempt the manufacturer from all liability.
Components that are handled as Field Replaceable Units
– CPU (replacement)
– SAS/SATA HDD backplane
– SAS expander board
– PCIe riser card
– Front panel module
– Front panel cable
– System board
– Trusted Platform Module (TPM)
– Power distribution board (PDB)
– Liquid cooling (LC)
– Non hot-plug PSUs
– Non hot-plug fan modules
– Fan cable
– Mid Plane kit
– Memory modules (special RX4770 M5 and memory slots from A to M on
bottom system board)
– M.2 SSDs (special RX4770 M5 and M.2 SSDs with 110 mm length)
I
Please ask your local Fujitsu service center for more information.
Field Replaceable Units (FRU)
Summary of Contents for PRIMERGY RX2530 M4
Page 22: ...Upgrade and Maintenance Manual RX2530 M4 Contents ...
Page 34: ...34 Upgrade and Maintenance Manual RX2530 M4 Before you start ...
Page 108: ...108 Upgrade and Maintenance Manual RX2530 M4 Basic software procedures ...
Page 128: ...128 Upgrade and Maintenance Manual RX2530 M4 Power supply unit PSU ...
Page 192: ...192 Upgrade and Maintenance Manual RX2530 M4 Hard disk drive HDD solid state drive SSD ...
Page 200: ...200 Upgrade and Maintenance Manual RX2530 M4 Fans ...
Page 358: ...358 Upgrade and Maintenance Manual RX2530 M4 Front panel ...
Page 436: ...436 Upgrade and Maintenance Manual RX2530 M4 Appendix A ...
Page 438: ...438 Upgrade and Maintenance Manual RX2530 M4 Appendix B ...
Page 465: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan January 2017 ...