RX2540 M2
Upgrade and Maintenance Manual
65
Basic hardware procedures
4.2
Shutting down the server
V
CAUTION!
For further safety information, please refer to chapter
.
I
This step is only required when upgrading or replacing non-hot plug
components.
Ê
Inform the system administrator that the server will be shut down and put
offline.
Ê
Terminate all applications.
Ê
Perform the required procedures described in the preliminary steps of each
upgrade or maintenance task.
Ê
"Verifying and configuring the backup software solution" on page 99
Ê
In case of Multipath I/O environments, please refer to section
server maintenance in a Multipath I/O environment" on page 100
.
Ê
"Removing backup and optical disk media" on page 99
.
Ê
Shut down the server.
I
If the system is running an ACPI-compliant operating system,
pressing the On/Off button will perform a graceful shutdown.
Ê
Switch on the ID indicator on the front and rear connector panels of the
server as described in section
Summary of Contents for PRIMERGY RX2540 M2
Page 6: ...Upgrade and Maintenance Manual RX2540 M2 ...
Page 48: ...48 Upgrade and Maintenance Manual RX2540 M2 Before you start ...
Page 128: ...128 Upgrade and Maintenance Manual RX2540 M2 Basic software procedures ...
Page 142: ...142 Upgrade and Maintenance Manual RX2540 M2 Power supply unit PSU ...
Page 392: ...392 Upgrade and Maintenance Manual RX2540 M2 Processor CPU ...
Page 452: ...452 Upgrade and Maintenance Manual RX2540 M2 Accessible drives ...
Page 558: ...558 Upgrade and Maintenance Manual RX2540 M2 System board and components ...
Page 602: ...602 Upgrade and Maintenance Manual RX2540 M2 Appendix ...