454
Upgrade and Maintenance Manual
RX2540 M4
Front panel
14.3.3.3 Removing the front VGA board
Ê
Remove the front VGA board, see section
"Removing the front VGA board"
.
14.3.3.4 Installing the new front VGA board
Ê
Install the new front VGA board, see section
"Installing the front VGA board"
.
14.3.3.5 Installing the front panel module
Ê
Install the front panel module, see section
14.3.3.6 Concluding steps
Ê
"Installing the fan holder" on page 234
Ê
Ê
"Connecting the power cord" on page 67
Ê
"Switching on the server" on page 70
Ê
"Resuming BitLocker functionality" on page 112
14.4 Front USB3.0 connector (2.5-inch version)
I
The maximum external cable length is limited to 3 m.
14.4.1 Installing the front USB3.0 connector
Upgrade and Repair Unit
(URU)
Hardware: 10 minutes
Tools:
Phillips PZ2 screw driver / hexagon screw driver 5 mm
Summary of Contents for PRIMERGY RX2540 M4
Page 40: ...40 Upgrade and Maintenance Manual RX2540 M4 Before you start ...
Page 90: ...90 Upgrade and Maintenance Manual RX2540 M4 Basic hardware procedures ...
Page 136: ...136 Upgrade and Maintenance Manual RX2540 M4 Power supply unit PSU ...
Page 228: ...228 Upgrade and Maintenance Manual RX2540 M4 Hard disk drives HDD and solid state drives SSD ...
Page 344: ...344 Upgrade and Maintenance Manual RX2540 M4 Main memory ...
Page 362: ...362 Upgrade and Maintenance Manual RX2540 M4 Processor CPU ...
Page 390: ...390 Upgrade and Maintenance Manual RX2540 M4 Liquid cooling LC ...
Page 498: ...498 Upgrade and Maintenance Manual RX2540 M4 Additional interfaces ...
Page 572: ...572 Upgrade and Maintenance Manual RX2540 M4 Appendix A ...
Page 574: ...574 Upgrade and Maintenance Manual RX2540 M4 Appendix B ...
Page 582: ...8 RX2540 M4 Basic Serial RS 232 Cable plan System Board D3384 RS 232 onboard RS 232 rear C6 ...
Page 634: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan January 2017 ...