RX900 S1
Maintenance Manual
147
Expansion cards and BBU
8.6.9
Activating the expansion card
Ê
Activate the expansion card using either the related PCI hot-plug software or
by pressing the light-pipe switch, see A in
Figure 69
.
The light-pipe switch flashes green. The slot is in the enable sequence.
Ê
Wait until the light-pipe switch is constantly green.
The slot is now powered on.
I
If the light-pipe switch continues to flash, an error has occurred.
Remove the expansion card and repeat the procedure as described
above.
8.6.10 Completing the task
Ê
Perform the following procedures to complete the task:
1.
"Installing the rear cover" on page 48
2.
"Mounting the server in the rack" on page 49
3.
"Closing the rack door" on page 51
Summary of Contents for PRIMERGY RX900 S1
Page 1: ...Maintenance Manual English PRIMERGY RX900 S1 Server Maintenance Manual Edition August 2010 ...
Page 6: ...6 Maintenance Manual RX900 S1 ...
Page 52: ...52 Maintenance Manual RX900 S1 Basic procedures ...
Page 100: ...100 Maintenance Manual RX900 S1 Hard disk and solid state drives ...
Page 180: ...180 Maintenance Manual RX900 S1 Expansion cards and BBU ...
Page 198: ...198 Maintenance Manual RX900 S1 Main memory ...
Page 226: ...226 Maintenance Manual RX900 S1 Optical and backup drives ...
Page 246: ...246 Maintenance Manual RX900 S1 Front panel and external connectors ...
Page 260: ...260 Maintenance Manual RX900 S1 Management and diagnostics modules ...