278
Upgrade and Maintenance Manual
TX140
S2
System board and components
Figure 181: Installing the system board (B)
Ê
Carefully shift the system board towards the server rear until the plug shells
engage with the cut-outs in the connector panel.
Ê
Lower the system board onto the centering bolts (C).
Ensure that the system board is properly seated on both centering bolts.
Ê
Secure the system board with eight screws (see circles in figure
176 on
page 275
).
I
Screw torque: 0.6 Nm (not applicable for the Japanese market)
Tighten the screws in a cross diagonal pattern.
Figure 182: Installing the power cable clamp
Ê
Press down on the power cable clamp until it snaps into place.
Summary of Contents for PRIMERGY TX140 S2
Page 30: ...30 Upgrade and Maintenance Manual TX140 S2 Before you start ...
Page 98: ...98 Upgrade and Maintenance Manual TX140 S2 Basic software procedures ...
Page 120: ...120 Upgrade and Maintenance Manual TX140 S2 Power supply ...
Page 148: ...148 Upgrade and Maintenance Manual TX140 S2 Hard disk drives solid state drives ...
Page 158: ...158 Upgrade and Maintenance Manual TX140 S2 System fan and air duct ...
Page 208: ...208 Upgrade and Maintenance Manual TX140 S2 Expansion cards and backup units ...
Page 216: ...216 Upgrade and Maintenance Manual TX140 S2 Main memory ...
Page 314: ...314 Upgrade and Maintenance Manual TX140 S2 Cabling ...
Page 332: ...332 Upgrade and Maintenance Manual TX140 S2 Appendix ...