68
Upgrade and Maintenance Manual
TX140
S2
Basic hardware procedures
4.7
Switching on the server
V
CAUTION!
●
Before switching on the server, make sure the top / side cover is
closed. In order to comply with applicable EMC regulations
(regulations on electromagnetic compatibility) and satisfy cooling
requirements, the server must not run while the top / side cover is
removed.
●
After connecting all power cords, wait at least 60 seconds before
pressing the On/Off button.
●
Follow the safety instructions in chapter
"Important information" on
page 31
.
Ê
Press the On / Off button to start up the server.
Ê
Ensure that the power-on indicator above the On / Off button is lit green.
Ê
Perform the required procedures described in the concluding steps of each
upgrade or maintenance task.
Summary of Contents for PRIMERGY TX140 S2
Page 30: ...30 Upgrade and Maintenance Manual TX140 S2 Before you start ...
Page 98: ...98 Upgrade and Maintenance Manual TX140 S2 Basic software procedures ...
Page 120: ...120 Upgrade and Maintenance Manual TX140 S2 Power supply ...
Page 148: ...148 Upgrade and Maintenance Manual TX140 S2 Hard disk drives solid state drives ...
Page 158: ...158 Upgrade and Maintenance Manual TX140 S2 System fan and air duct ...
Page 208: ...208 Upgrade and Maintenance Manual TX140 S2 Expansion cards and backup units ...
Page 216: ...216 Upgrade and Maintenance Manual TX140 S2 Main memory ...
Page 314: ...314 Upgrade and Maintenance Manual TX140 S2 Cabling ...
Page 332: ...332 Upgrade and Maintenance Manual TX140 S2 Appendix ...