50
Operating manual
TX300
S4
Installing/removing the rack model
Hardware installation
Two retaining bolts rear
Figure 6: Fit the left telescopic rail in the PRIMECENTER/DataCenter Rack
Ê
Place the left support system (1) in the support bracket (a) with the two
retaining bolts (b) in the two outer square catches.
Ê
Clamp the left-hand rail (2) between the front left support upright (c) and the
support bracket (a) by pressing the rail together, positioning the rail on the
front support upright, and releasing them again. The rail automatically
adjusts to the rack depth.
Ê
Fasten the left support system with a centering fixture M5 (3) to the left front
support upright (c).
Ê
Repeat the above steps with the right-hand support system (it is secured to
the front and rear right support uprights).
Ê
Fit the cage nuts for securing the server in the corresponding catch on the
right and left support uprights.
Ê
Fit the PRIMECENTER/DataCenter Rack cable management as described
in the technical manual for the rack.
Ê
Insert the server (see section
“Inserting the server” on page 58
).
Ê
Route the cables once the server has been inserted, as described in the
Technical Manual for the rack.
a
c
2
3
1 x M5
b
1