6-1
C H A P T E R
6
Finishing Up Servicing
This chapter describes how to finish up servicing the server.
The following topics are covered:
■
Section 6.1.1, “Replacing the Top Cover” on page 6-1
■
Section 6.1.2, “Reinstalling the Server Chassis in the Rack” on page 6-1
■
Section 6.1.3, “Applying Power to the Server” on page 6-2
6.1
Final Service Procedures
This section provides the finishing tasks in servicing your server.
6.1.1
Replacing the Top Cover
1. Place the top cover on the chassis.
Set the cover down so that the cover hangs over the rear of the server by about an
inch (2.5 cm).
2. Slide the cover forward until it latches into place.
6.1.2
Reinstalling the Server Chassis in the Rack
1. Refer to the
SPARC Enterprise T1000 Server Installation Guide
for installation
instructions.
2. After you have reinstalled the server chassis in the rack, reconnect all cables that
you disconnected when you removed the chassis from the rack.
Summary of Contents for SPARC ENTERPRISE T1000
Page 1: ......
Page 2: ......
Page 6: ......
Page 11: ...Contents ix Index Index 1 ...
Page 12: ...x SPARC Enterprise T1000 Server Service Manual April 2007 ...
Page 16: ...xiv SPARC Enterprise T1000 Server Service Manual April 2007 ...
Page 25: ...Preface xxiii Reader s Comment Form ...
Page 32: ...2 4 SPARC Enterprise T1000 Server Service Manual April 2007 ...
Page 35: ...Chapter 3 Server Diagnostics 3 3 FIGURE 3 1 Diagnostic Flow Chart flow chart ...
Page 86: ...3 54 SPARC Enterprise T1000 Server Service Manual April 2007 ...
Page 126: ...A 4 SPARC Enterprise T1000 Server Service Manual April 2007 ...
Page 130: ...Index 4 SPARC Enterprise T1000 Server Service Manual April 2007 ...
Page 131: ......
Page 132: ......